The work continues as we prepare the ground incorporating manure into the soil as well as breaking it up. We have all the beads planned out, the long bed is dug and needs more manure then digging it in. The top bed is almost finished with just a little section of manure to be incorporated. The middle bed is almost dug and ready for its covering with manure. And lastly the fruit cage and experimental bed is being dig and will soon needs its manure.
Here is some pictures of the progress.